PREPARE THE BRIEF. COMPARE THE FULL OFFER.

Procurement Checklist
& RFQ Guide

Buying a flexo press starts with a clear production brief. Use this checklist to prepare your request for quotation, compare equipment and costs, and agree how the machine will be tested, delivered and supported.

Three procurement tasks: define the requirement, compare proposals and verify the agreed equipment and supportFLEXO EQUIPMENT PROCUREMENTOne brief. Comparable proposals.01DEFINEMaterials + finished output02COMPAREEquipment + responsibilities03VERIFYTrial + delivery + supportYOUR RFQ PACKMaterial dataArtwork + sizesProduction needsFinishing + siteSUPPLIER RESPONSEItemized configuration and exclusionsJob-specific trial and delivery planWritten installation and service scopeA preparation workflow, not a fixed payment or acceptance sequence.
A practical buying workflow for CI, stack and label flexo equipment. The actual purchase milestones need agreement.

What should you send first?

Send the material, artwork dimensions, color count, typical orders and required finished output. Add your current production problem and target installation date; you do not need a model number to start.

What should come back?

Ask for an itemized configuration, included tools and options, price basis, trial plan, delivery milestones and service scope. Record any alternatives or open questions against the same brief.

01 / PREPARE AND REVIEW

Work through the purchase one requirement at a time.

Use the checklist for a first inquiry or a detailed proposal review. Share what you know and discuss any missing information with the supplier.

Hover or click a factor below

Your preparation checklist

Tick items as you prepare the brief and review the reply. You can send an inquiry before every item is complete.

0 of 21 preparation checks marked
Material, artwork layout and finished-output details to include in a flexo equipment RFQDescribe what you need to print.The material data sheet and sample artwork make the inquiry more useful.01MATERIALFilm grade, layers, thickness or paper weightFor labels: face material, adhesive and liner02PRINTED LAYOUTFull roll width, usable print width and repeatArtwork dimensions, colors and print faces03FINISHED OUTPUTPrinted roll, labels, slit rolls or sheetsRoll diameter, core, weight and winding directionSend the difficult stock and artwork too; a simple sample may hide the real requirement.BUYER GUIDE ILLUSTRATION · NOT AN ENGINEERING DRAWING
Prepare the actual job and finished-output requirements before selecting the equipment.

01 / 07

What must the machine produce?

Define the job before choosing a model. An RFQ, or request for quotation, gives suppliers a common set of requirements for a priced equipment proposal.

WHAT TO PREPARE

Describe the complete material

For film, give the grade, layers, thickness and surface treatment. For paper or nonwoven, give the weight per square meter. For self-adhesive labels, identify the face, adhesive and release liner. Include stock data sheets and representative samples.

WHAT TO CONFIRM

Show the layout and finished result

Give full roll width, usable print width, shortest and longest repeats, ink separations and colors per face. State whether you need printed rolls, die-cut labels, slit rolls or sheets. For labels, include gaps, lane count and the cutting outline.

PREPARATION CHECKS

You can start an inquiry without a model number. Send what you know and identify the requirements still to be discussed.

Comparison principleGive each supplier the same brief and compare the same equipment, test conditions and responsibility boundaries.

Need help turning your job into an RFQ?

Share your material, print requirements and the production problem you want the next machine to solve.

Review My Procurement Requirements

02 / COMPARE THE QUOTATIONS

Make the scope comparable before comparing the price.

Use a side-by-side record. Mark each required item as included, priced option, excluded or not confirmed, and keep the supplier response or document reference.

CompareRecord in each quotationBuyer check
Equipment and toolsModules, operating ranges, controls, tools, initial spares and supplied quantitiesAre the items needed to run the same jobs included?
Usable outputMaterial, artwork, ink, width, speed, trial duration, accepted output and wasteWere the machines compared under matching conditions?
Price basisCurrency, validity, required options, exclusions and any unpriced itemsWhich costs still need a price or an owner?
Transport and siteTrade term and named place; packing, transport, unloading and installation scopeWho arranges and pays for each step?
Acceptance and scheduleFactory test, report, open items, lead-time trigger, dispatch and site commissioningWhat is agreed, what is conditional and what remains open?
Training and supportCommissioning, training, warranty coverage, spare parts and service costsIs the support scope suitable for your team and location?

Not confirmed means the answer is still open. Keep it visible until the supplier clarifies the scope or price.

Have a configuration or scope question?

Ask RAZP to clarify the proposed equipment, tools, trial and supply responsibilities for your project.

Clarify My Quotation Scope

03 / ADD THE PRESS-SPECIFIC DETAILS

The same RFQ structure, with different machine questions.

Use the relevant product page as a starting point, then request a proposal for the exact stock, artwork and output you need.

RAZP CI flexo press — official product-page image
Official RAZP product image. Example configuration; images are not shown to the same scale.

For a CI flexo press

Confirm material handling around the central impression drum, drive and register functions, drying and roll changes. Ask for the actual configuration and a representative print trial.

Explore this press example
RAZP ZJR label flexo press — official product-page image
Official RAZP product image. Example configuration; images are not shown to the same scale.

For a label flexo press

Add face material, adhesive, liner, label layout, die outline and finished-roll format. Identify which converting tools and modules are included or supplied separately.

Explore this press example

04 / PREPARE YOUR RFQ PACK

Send one clear brief for your next flexo project.

Use the templates below, then share your requirements with RAZP to discuss equipment, trial conditions and quotation scope. List unknowns as questions rather than guessing.

Request an Equipment Proposal
  • 01Material data and representative artwork
  • 02Print sizes, colors, ink and finishing
  • 03Typical jobs and accepted-output target
  • 04Roll handling, site layout and utilities
  • 05Trial criteria and delivery milestones
  • 06Tools, training, warranty and service scope

05 / BUYER QUESTIONS

Questions before sending an RFQ

Do I need to choose a model before sending an RFQ?

No. Start with your material, artwork dimensions, colors, finished product, typical orders and production goal. A model can be proposed once the operating and finishing requirements are clearer.

What is the difference between a budget estimate and a detailed quotation?

A budget estimate helps you assess a project using stated assumptions. A detailed quotation should identify the machine and revision, itemized scope, price basis, exclusions, validity and commercial conditions. Ask what information is still needed before the proposal can be finalized.

Which samples and files should I prepare?

Provide stock data sheets, a representative sample roll, artwork with dimensions and color separations, and an accepted finished sample if available. For labels, include the liner, cutting outline, gaps and finished-roll requirements. Identify the file versions and discuss suitable sample quantities with the supplier.

How do I compare two machines with different headline speeds?

Ask both suppliers to print the same representative job under agreed conditions. Compare accepted output, waste, drying or cure, alignment, finishing and roll quality. Record setup and changeover separately so the output calculation is clear.

Does a general factory run test count as my FAT?

Only if the agreed plan covers your acceptance requirements. Define the actual machine, stock, artwork, ink, operating conditions, sampling, checks and pass criteria. Record deviations, corrective actions, any retest and the shipment decision.

Does an Incoterms rule also define payment or acceptance?

No. Incoterms rules allocate delivery responsibilities, costs and risk. Write the chosen rule, named place and version where used, then agree payment events, equipment specifications, accepta