PREPARE THE BRIEF. COMPARE THE FULL OFFER.
Procurement Checklist
& RFQ Guide
Buying a flexo press starts with a clear production brief. Use this checklist to prepare your request for quotation, compare equipment and costs, and agree how the machine will be tested, delivered and supported.
What should you send first?
Send the material, artwork dimensions, color count, typical orders and required finished output. Add your current production problem and target installation date; you do not need a model number to start.
What should come back?
Ask for an itemized configuration, included tools and options, price basis, trial plan, delivery milestones and service scope. Record any alternatives or open questions against the same brief.
01 / PREPARE AND REVIEW
Work through the purchase one requirement at a time.
Use the checklist for a first inquiry or a detailed proposal review. Share what you know and discuss any missing information with the supplier.
Hover or click a factor below
Your preparation checklist
Tick items as you prepare the brief and review the reply. You can send an inquiry before every item is complete.
01 / 07
What must the machine produce?
Define the job before choosing a model. An RFQ, or request for quotation, gives suppliers a common set of requirements for a priced equipment proposal.
Describe the complete material
For film, give the grade, layers, thickness and surface treatment. For paper or nonwoven, give the weight per square meter. For self-adhesive labels, identify the face, adhesive and release liner. Include stock data sheets and representative samples.
Show the layout and finished result
Give full roll width, usable print width, shortest and longest repeats, ink separations and colors per face. State whether you need printed rolls, die-cut labels, slit rolls or sheets. For labels, include gaps, lane count and the cutting outline.
You can start an inquiry without a model number. Send what you know and identify the requirements still to be discussed.
02 / 07
What work must the press handle each day?
Give a representative mix of orders rather than only the highest desired speed. A proposal becomes more useful when the supplier knows run lengths, job changes and the output that currently meets your quality requirements.
Describe the production baseline
Share typical order lengths, repeat frequency, artwork versions and changes per shift. If you are replacing a press, provide its accepted output, setup waste, changeover time and the problems you want to solve.
Set a measurable target
Separate mechanical speed from printing speed on your job and accepted finished output. State the intended material, width, ink coverage, quality target and finishing steps. Ask for a demonstration and record what is included in the output calculation.
Printed meters, accepted labels and finished rolls are different measures. Do not compare a supplier headline speed with your shift output as though they were equivalent.
03 / 07
What exactly is included in each proposal?
Ask for an itemized equipment list. The model name and words such as servo or automatic do not explain every supplied function, tool or operating sequence.
List the printing and roll-handling configuration
Confirm color stations, anilox specifications, plate or cylinder requirements, ink supply and drying or curing. Identify the drive, tension, web guide and registration functions. For unwind and rewind, ask for roll sizes, loading method and the complete change sequence.
Include the tools and finishing equipment
State which plates, cylinders, sleeves where applicable, anilox rollers, dies and slitting tools are supplied. For labels, list die-cutting, waste removal, coatings, slitting and final roll requirements. Ask whether each required process is inline or uses separate equipment.
Treat an unlisted function as not confirmed. An extra roll position does not establish non-stop production, and a touchscreen does not establish automatic register control.
04 / 07
How will you judge the proposed machine?
Agree a factory acceptance test, or FAT, before shipment. The plan should name the material, artwork, operating conditions, checks and recorded results for the machine being supplied.
Set the test conditions and acceptance criteria
Include ink, coverage, width, repeat, running speed, trial duration and sampling method. Agree separate checks for color alignment, print appearance, drying or cure and roll quality. For labels, add print-to-die alignment, cut quality, waste removal and any specified code verification.
Record results and unresolved items
Identify the machine and configuration, keep sample references and record accepted output and waste. Demonstrate an agreed job change and roll change. List deviations, actions, owners and any retest, then record the agreed shipment decision and site checks.
A supplier general run-test claim is not a substitute for your job-specific acceptance plan. Keep the factory trial and site commissioning requirements distinct.
05 / 07
Can the press be delivered and installed as planned?
Share the factory layout and target production date early. Dispatch, arrival, installation and production readiness are different milestones and need separate dates and responsibilities.
Confirm the site and access requirements
Request a layout showing machine footprint, operating and maintenance space, roll access and unloading needs. Exchange power supply and other utility details, including air, cooling or ventilation where required. Request the documents applicable to the exact machine and destination.
Define the schedule and handover points
Ask what starts the production lead time and which approvals or samples are needed. Separate specification approval, factory test, packing, dispatch, transit and commissioning. Confirm who arranges unloading, positioning, connections and site preparation before installation begins.
Use the model-specific installation drawing and utility schedule. A catalog power figure alone does not define the supply, connections or complete site requirements.
06 / 07
Are the prices being compared on the same basis?
Compare the complete scope needed to run your jobs. Keep the machine and required tools, transport and site costs, and commercial terms visible rather than comparing the first price line alone.
Put the cost items side by side
Record currency, quotation date, validity, base equipment, required options and tools. Clarify packing, transport, insurance, import-related charges, unloading, commissioning, training and local costs as applicable. Mark who provides and pays for each item without counting it twice.
Confirm payment and delivery terms separately
Request the payment amounts or percentages, due events and required documents. If using Incoterms, state the chosen rule, named port or place and version, such as Incoterms 2020. These rules address delivery responsibilities, costs and risk; they do not set payment timing or equipment acceptance.
Record optional and excluded items explicitly. An unpriced option or an unconfirmed charge should not silently become zero in a comparison.
07 / 07
Who supports the press after delivery?
Agree installation, operator training, warranty and ongoing technical support as separate parts of the purchase. Direct buyers and distributors may have different arrangements.
Define training and warranty coverage
State who commissions the press, which operators attend and which jobs and maintenance tasks are demonstrated. Confirm training language and documents. For warranty, write the start event, duration, covered parts, exclusions and responsibility for labor, freight and travel.
Plan service and spare parts
Identify the service contact, communication method and remote or onsite support scope. Ask for recommended wear parts, critical spares, current availability and replacement lead times. Confirm maintenance documents, electrical drawings and applicable software access or backup arrangements.
Initial technical response is different from onsite arrival or repair completion. Use the support terms for your order rather than applying a dealer-program promise to every purchase.
Comparison principleGive each supplier the same brief and compare the same equipment, test conditions and responsibility boundaries.
Need help turning your job into an RFQ?
Share your material, print requirements and the production problem you want the next machine to solve.
02 / COMPARE THE QUOTATIONS
Make the scope comparable before comparing the price.
Use a side-by-side record. Mark each required item as included, priced option, excluded or not confirmed, and keep the supplier response or document reference.
| Compare | Record in each quotation | Buyer check |
|---|---|---|
| Equipment and tools | Modules, operating ranges, controls, tools, initial spares and supplied quantities | Are the items needed to run the same jobs included? |
| Usable output | Material, artwork, ink, width, speed, trial duration, accepted output and waste | Were the machines compared under matching conditions? |
| Price basis | Currency, validity, required options, exclusions and any unpriced items | Which costs still need a price or an owner? |
| Transport and site | Trade term and named place; packing, transport, unloading and installation scope | Who arranges and pays for each step? |
| Acceptance and schedule | Factory test, report, open items, lead-time trigger, dispatch and site commissioning | What is agreed, what is conditional and what remains open? |
| Training and support | Commissioning, training, warranty coverage, spare parts and service costs | Is the support scope suitable for your team and location? |
Not confirmed means the answer is still open. Keep it visible until the supplier clarifies the scope or price.
Have a configuration or scope question?
Ask RAZP to clarify the proposed equipment, tools, trial and supply responsibilities for your project.
03 / ADD THE PRESS-SPECIFIC DETAILS
The same RFQ structure, with different machine questions.
Use the relevant product page as a starting point, then request a proposal for the exact stock, artwork and output you need.
For a CI flexo press
Confirm material handling around the central impression drum, drive and register functions, drying and roll changes. Ask for the actual configuration and a representative print trial.
Explore this press exampleFor a label flexo press
Add face material, adhesive, liner, label layout, die outline and finished-roll format. Identify which converting tools and modules are included or supplied separately.
Explore this press example04 / PREPARE YOUR RFQ PACK
Send one clear brief for your next flexo project.
Use the templates below, then share your requirements with RAZP to discuss equipment, trial conditions and quotation scope. List unknowns as questions rather than guessing.
Request an Equipment Proposal- 01Material data and representative artwork
- 02Print sizes, colors, ink and finishing
- 03Typical jobs and accepted-output target
- 04Roll handling, site layout and utilities
- 05Trial criteria and delivery milestones
- 06Tools, training, warranty and service scope
RFQ requirement template
Fill in your stock, artwork, production, site and service requirements.
Download RFQ template (.txt)Quotation comparison sheet
Compare three supplier replies, prices, exclusions and open questions.
Download comparison sheet (.csv)Factory-trial planning record
Agree test conditions, pass criteria, recorded results and follow-up.
Download FAT record (.txt)05 / BUYER QUESTIONS
Questions before sending an RFQ
Do I need to choose a model before sending an RFQ?
No. Start with your material, artwork dimensions, colors, finished product, typical orders and production goal. A model can be proposed once the operating and finishing requirements are clearer.
What is the difference between a budget estimate and a detailed quotation?
A budget estimate helps you assess a project using stated assumptions. A detailed quotation should identify the machine and revision, itemized scope, price basis, exclusions, validity and commercial conditions. Ask what information is still needed before the proposal can be finalized.
Which samples and files should I prepare?
Provide stock data sheets, a representative sample roll, artwork with dimensions and color separations, and an accepted finished sample if available. For labels, include the liner, cutting outline, gaps and finished-roll requirements. Identify the file versions and discuss suitable sample quantities with the supplier.
How do I compare two machines with different headline speeds?
Ask both suppliers to print the same representative job under agreed conditions. Compare accepted output, waste, drying or cure, alignment, finishing and roll quality. Record setup and changeover separately so the output calculation is clear.
Does a general factory run test count as my FAT?
Only if the agreed plan covers your acceptance requirements. Define the actual machine, stock, artwork, ink, operating conditions, sampling, checks and pass criteria. Record deviations, corrective actions, any retest and the shipment decision.
Does an Incoterms rule also define payment or acceptance?
No. Incoterms rules allocate delivery responsibilities, costs and risk. Write the chosen rule, named place and version where used, then agree payment events, equipment specifications, accepta
