MATCH THE PRESS TO YOUR PRINTING JOBS.
How to Choose a
CI Flexo
Printing Machine
A CI press uses one common impression drum to support roll-fed material through the color stations. Start with your material and artwork, then choose the controls, drying and roll handling your production needs.
Start with a representative job.
Provide the material, artwork, roll width, print width, design repeat and ink separations. Include the jobs that are hardest to run, not only the easiest sample.
Choose a complete production setup.
Compare usable output, job-change time, drying and finished-roll quality. The best proposal explains the machine and options needed to meet those requirements.
01 / CI PRESS SELECTION
Define your requirements, one factor at a time.
Use these seven checks to prepare a clear inquiry and compare the machines actually offered.
Hover or click a factor below
01 / 07
What material will you print?
Start with the actual film, paper, nonwoven or tissue you use. The material affects tension, handling and drying requirements.
Give the full material specification
For film, state the grade, layers and thickness. For paper or nonwoven, give the weight per square meter, surface treatment and printable side.
Choose around the demanding jobs
Include the thinnest, widest or most difficult material you plan to run. A general material name is not enough to choose a machine.
WHAT TO PREPARE
- A sample roll, material specification and ink details
- The smallest and largest roll widths and the range of material grades
A press listed for one material is not automatically suitable for every film, paper or fabric. Use an actual material trial.
02 / 07
Will your roll and printed design fit?
Roll width is the full material width. Print width is the usable printed area across it. Repeat length is the length of one repeated design along the material.
Check width across the roll
The machine must accept the incoming roll and provide enough print width for the artwork, layout and edge allowances. Ask for the minimum width as well as the maximum.
Check repeat along the roll
Send the shortest and longest design repeats you need. Ask which repeat lengths are supported and which plates, cylinders or sleeves are included.
WHAT TO PREPARE
- A dimensioned artwork layout with edge and trim allowances
- Roll width, usable print width and the required repeat range
Do not buy from maximum roll width alone. A wider roll capacity does not mean the entire width can be printed.
03 / 07
How many printing stations does your artwork need?
Count each ink separation. Cyan, magenta, yellow and black are the four process inks, often called CMYK. White or a separate brand color may need additional stations.
Count the inks in real jobs
For example, four process inks plus white and one separately mixed brand color make six separations. Ask whether the proposed press can print that job in one pass.
Match the ink and drying system
State whether you use water-based or solvent-based ink. Ask about the required ink circuit, drying, exhaust and cleaning arrangement for the material.
WHAT TO PREPARE
- Artwork showing each process, white and spot-color separation
- Required ink type and any separate printing or coating operation
Four- and six-color examples explain ink counting. The available color count, ink system and extra operations must be agreed for the specific press.
04 / 07
How much usable print do you need per shift?
Define output as printed meters that meet your quality requirements. Include setup time, rejected print, cleaning and roll changes when planning daily capacity.
Use your typical orders
Give the usual order length, changes per shift and required delivery volume. A long repeat run and many short orders need different capacity discussions.
Check drying at the target speed
Use the intended material, ink coverage and printing width in the trial. Check between-color drying, final drying, cooling where needed and finished-roll quality.
WHAT TO PREPARE
- Usable output for a representative job, with setup waste recorded
- Printing speed supported by the drying and winding results
Mechanical speed is not proof of usable printing speed. Do not multiply the headline maximum by the entire shift to estimate saleable output.
05 / 07
Which controls help your print quality and job changes?
Registration means how closely the printed colors line up. The drive system and adjustment controls affect how the operator sets and maintains that alignment.
Ask what the drive actually includes
CI means central impression; it does not mean gearless or full servo. Ask how the printing units are driven and which parts have independent servo drives.
Watch setup and a complete job change
Check color-alignment adjustment, saved job settings, plate changes and ink-system cleaning. An anilox roller controls how much ink reaches the plate; include its change and cleaning needs.
WHAT TO PREPARE
- Color alignment at startup, steady running and speed changes
- The time, operators and material needed to move between two typical jobs
Manual, electric and automatic adjustment are different descriptions. Ask the supplier to show which functions the operator performs and which the machine controls.
06 / 07
How will operators load, change and rewind rolls?
Roll loading moves a roll into or out of the machine. A roll change moves production from one roll to another. Treat these as separate requirements.
Define loading and roll changes
Give the full-roll weight, diameter and core size. Ask whether loading is manual or assisted and what happens when material runs out or a finished roll is full.
Check the winding system with your material
Discuss center-driven or friction-based winding around the material and finished-roll requirements. Ask the supplier to explain the proposed system and show the result in a trial.
WHAT TO PREPARE
- Loading method, roll limits, splicing and roll-transfer sequence at both ends
- Finished-roll tension, edges, tightness and the winding direction
Automatic loading does not establish non-stop roll changes. A turret rewinder does not by itself prove non-stop unwinding; request the complete operating sequence.
07 / 07
How will you check and install the press?
Agree a factory acceptance test (FAT): a machine check before shipment using a defined test plan. Prepare the installation and service requirements at the same time.
Put the test conditions in writing
Name the sample material, ink, artwork, speed and duration. Record acceptable color alignment, drying, usable output, setup waste and finished-roll quality.
Plan the complete installation
Ask for a layout with operating and maintenance space. Check power, air, exhaust, access for moving rolls, training, spare parts and the responsibilities for installation.
WHAT TO PREPARE
- A test report linked to the agreed material and equipment configuration
- Installation drawings, utility requirements and a written support scope
Compare the complete purchase: machine, options, installation, tools, training and running costs. A quotation is easier to assess when each supplier uses the same requirements.
Selection principleUse one job specification for every quotation. Compare the proposed equipment and print-trial results against that same specification.
Turn your requirements into a CI press proposal.
Share your material, print width, artwork and output needs to discuss a suitable configuration.
02 / DEFINE THE JOB
Put the same requirements in every inquiry.
A short, complete job brief makes supplier proposals easier to compare.
| Requirement | What to specify | Question to answer |
|---|---|---|
| Material | Type, thickness or basis weight, layers and surface treatment | Can the proposed press run the full material range? |
| Print dimensions | Roll width, usable print width and design repeat range | Will the artwork and edge allowances fit? |
| Colors and ink | Ink separations, white or spot colors, and ink type | Can the job be printed in the proposed number of passes? |
| Output and changes | Typical order lengths, daily output and changes per shift | What usable output remains after setup, drying limits and roll changes? |
| Roll handling | Roll weight, diameter, core size and winding direction | How are rolls loaded, changed and rewound? |
| Trial and installation | Test jobs, quality targets, factory layout and utilities | How will performance, installation and support be checked? |
Check your printing requirements with RAZP.
Tell us which job details you already have and which equipment options you need help comparing.
03 / EXPLORE RAZP CI PRESSES
Start with the features your jobs need.
These product pages illustrate different CI configurations. Ask for a current proposal covering your material, print quality and handling requirements.
Full-servo CI press
Discuss this configuration when independent servo drives and setup controls are relevant to your film-printing jobs. Check the included functions and demonstrate the actual job change.
CI presses with roll-handling options
Compare automatic roll loading and a turret rewinder as separate functions. Choose around roll size, handling needs and the complete roll-change sequence.
Browse CI configurations by application and handling needs
- Water-based CI press for packaging
- CI press for napkin and tissue printing
- CI press for plastic film
- CI press for paper
- CI press for nonwoven materials
- Water-based CI press with electric register adjustment
- CI press with friction-based winding
- CI press with turret rewinder
- CI press with center-driven winding and automatic loading
- CI press with centralized roll handling
- CI press for four-color water-based jobs
- Full-servo CI press for film packaging
04 / PREPARE YOUR INQUIRY
Send a job brief. Get a clearer proposal.
Share the details below with RAZP to discuss a CI press and the equipment needed for your production. Use the same brief when comparing quotations.
Discuss your CI press requirements- 01Material type, thickness and sample roll
- 02Roll width, print width and design repeat
- 03Ink separations, ink type and artwork
- 04Order lengths, output and job changes
- 05Roll sizes, weight, cores and winding needs
- 06Factory utilities, trial targets and support
05 / BUYER QUESTIONS
Questions before choosing your CI press
Should I choose a four-color or six-color CI press?
Count the ink separations in your actual artwork. Four process inks plus white and one separate brand color make six in one example. The number of stations needed also depends on the planned print route and any additional operations. Ask for an artwork-based recommendation.
Is a gearless or full-servo CI press always necessary?
No single drive choice fits every order. Compare the required print quality, repeat range, job changes, operator needs and budget. Ask which functions are included and watch them on the proposed machine.
How do I choose the right printing speed?
Start with usable output per shift and your typical order lengths. Test the intended material, ink and artwork at the proposed running speed, including drying and finished-roll checks. Mechanical maximum speed is a separate figure.
What is the difference between roll width and print width?
Roll width is the full width of the material entering the machine. Print width is the usable printed area across it. Allow for the artwork layout and any required edges or trimming; check both values in the quotation.
Does automatic roll loading mean non-stop production?
No. Loading positions a roll in the machine. Continuous roll changes also require the relevant splicing, cutting, roll-transfer and control functions. Check the unwind and rewind arrangements separately and request a demonstration.
What should a factory trial include?
Agree the material, ink, artwork, speed, run duration and quality targets. Record color alignment, drying, usable output, setup waste, job changes and finished-roll quality. Identify the equipment used so the trial represents the machine being purchased.
Still have a question about your CI press?
Ask about color count, drive options, drying or roll handling before you request a detailed quotation.
Technical references & product information
- FTA — Central Impression Press Buyer’s Guide · Buying considerations for materials, width, colors, job changes and drying.
- FTA — Flexography: Principles and Practices glossary · CI structure and terminology.
- RAZP — CI and stack press collection · Product-family and individual configuration pages.
- RAZP — Full-servo CI press · Example drive configuration.
- RAZP — CI press with automatic roll loading · Example handling configuration.
- RAZP — CI press with turret rewinder · A separate roll-handling option.
Illustrations explain selection requirements; they are not engineering drawings or machine-performance specifications. Use the current proposal, equipment list and print-trial results for the final decision.
