{"id":2444,"date":"2026-11-16T14:10:00","date_gmt":"2026-11-16T06:10:00","guid":{"rendered":"https:\/\/www.zp-flexopress.com\/?p=2444"},"modified":"2026-11-17T12:37:05","modified_gmt":"2026-11-17T04:37:05","slug":"new-vs-used-flexo-press","status":"publish","type":"post","link":"https:\/\/www.zp-flexopress.com\/fr\/blog\/buying-guide\/new-vs-used-flexo-press\/","title":{"rendered":"Presse flexographique neuve ou d'occasion : co\u00fbt, risque, inspection et support compar\u00e9s"},"content":{"rendered":"<h2>R\u00e9ponse rapide<\/h2>\n<p>Choisissez une presse flexo neuve lorsque vous avez besoin d'une configuration d\u00e9finie et d'un seul fournisseur pour les sp\u00e9cifications, la mise en service et le support. Envisagez une presse d'occasion lorsque l'unit\u00e9 exacte peut faire le m\u00eame travail, qu'une inspection document\u00e9e soutient son \u00e9tat et que les pi\u00e8ces critiques restent disponibles. Le chiffre d\u00e9cisif est le co\u00fbt total install\u00e9 plus l'exposition aux temps d'arr\u00eat, pas le prix affich\u00e9. Les processus de fabrication, de configuration et de contr\u00f4le qualit\u00e9 par \u00e9tapes publi\u00e9s par RAZP donnent aux acheteurs de presses neuves un parcours de projet plus clair, mais la sp\u00e9cification finale et les conditions d'acceptation appartiennent toujours au devis.<\/p>\n<h2>D\u00e9cision rapide : Neuf ou d'occasion ?<\/h2>\n<p>Traitez une presse neuve comme un projet devis\u00e9 et une presse d'occasion comme un actif sp\u00e9cifique avec un historique. Si ces ensembles ne correspondent pas en largeur, en nombre de couleurs, en gamme de substrats, en s\u00e9chage, en finition, en vitesse et en support op\u00e9rateur, les prix ne sont pas une comparaison \u00e9quivalente.<\/p>\n<table>\n<thead>\n<tr>\n<th>Facteur de d\u00e9cision<\/th>\n<th>Presse neuve<\/th>\n<th>Presse d'occasion<\/th>\n<th>Ce dont l'acheteur a besoin<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Base de prix<\/td>\n<td>Devis du fournisseur pour une configuration sp\u00e9cifi\u00e9e<\/td>\n<td>Prix catalogue plus budget de r\u00e9paration et de reconfiguration<\/td>\n<td>La m\u00eame port\u00e9e livr\u00e9e, la m\u00eame devise, le m\u00eame march\u00e9 et la m\u00eame date<\/td>\n<\/tr>\n<tr>\n<td>Ad\u00e9quation de la configuration<\/td>\n<td>Sp\u00e9cification \u00e9crite et options s\u00e9lectionn\u00e9es<\/td>\n<td>Machine physique et liste des \u00e9quipements existants<\/td>\n<td>Un cahier des charges correspondant<\/td>\n<\/tr>\n<tr>\n<td>Preuve de l'\u00e9tat<\/td>\n<td>Contr\u00f4les en usine et test d'acceptation convenu<\/td>\n<td>Dossiers, inspection et test de fonctionnement repr\u00e9sentatif<\/td>\n<td>Crit\u00e8res de r\u00e9ussite mesurables<\/td>\n<\/tr>\n<tr>\n<td>Commandes et logiciels<\/td>\n<td>Configuration actuelle indiqu\u00e9e dans le devis<\/td>\n<td>Contr\u00f4leur, version du logiciel, sauvegardes et support v\u00e9rifi\u00e9s par num\u00e9ro de s\u00e9rie<\/td>\n<td>Version \u00e9crite et confirmation du support<\/td>\n<\/tr>\n<tr>\n<td>Pi\u00e8ces de rechange critiques<\/td>\n<td>Voie du fournisseur et conditions commerciales<\/td>\n<td>Voie OEM ou tierce partie qualifi\u00e9e avec d\u00e9lais<\/td>\n<td>Une source nomm\u00e9e pour chaque d\u00e9faillance critique<\/td>\n<\/tr>\n<tr>\n<td>Garantie et formation<\/td>\n<td>Conditions \u00e9crites, exclusions et plan de formation<\/td>\n<td>Conditions telles quelles, concessionnaire ou n\u00e9goci\u00e9es<\/td>\n<td>Langage contractuel, pas une description de vente<\/td>\n<\/tr>\n<tr>\n<td>Exposition principale<\/td>\n<td>\u00c9carts de port\u00e9e entre la commande et la production<\/td>\n<td>Usure cach\u00e9e ou \u00e9lectronique non prise en charge<\/td>\n<td>Preuve ind\u00e9pendante avant paiement<\/td>\n<\/tr>\n<tr>\n<td>Forte ad\u00e9quation<\/td>\n<td>Nouvelle capacit\u00e9, une voie de croissance claire ou une maintenance interne limit\u00e9e<\/td>\n<td>Ajout de capacit\u00e9 o\u00f9 l'\u00e9quipe peut inspecter et supporter la machine<\/td>\n<td>Une d\u00e9cision bas\u00e9e sur le mod\u00e8le d'exploitation de l'acheteur<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>C'est le probl\u00e8me central dans toute comparaison de presses d'impression flexo d'occasion par rapport \u00e0 des neuves : \u201cneuf\u201d et \u201cd'occasion\u201d ne sont pas deux niveaux de produits distincts. L'un est une construction propos\u00e9e ; l'autre est une unit\u00e9 vieillissante dont la valeur d\u00e9pend de l'\u00e9tat document\u00e9, de la configuration et du support.<\/p>\n<h2>Qu'est-ce qui influence r\u00e9ellement le co\u00fbt total install\u00e9 ?<\/h2>\n<h3>Pourquoi le prix d'achat n'est-il qu'une ligne ?<\/h3>\n<p>Le prix de la facture vous indique combien de capital le vendeur souhaite, pas combien co\u00fbte la production pour d\u00e9marrer. Le fret, les droits d'importation, le grutage, la pr\u00e9paration \u00e9lectrique, l'air comprim\u00e9, l'\u00e9chappement, l'installation, la mise en service, la formation, l'outillage, l'\u00e9talonnage, la r\u00e9paration et les pi\u00e8ces de rechange initiales peuvent changer la r\u00e9ponse. Il en va de m\u00eame pour les temps d'arr\u00eat pendant que la presse est d\u00e9plac\u00e9e, r\u00e9par\u00e9e ou mise aux sp\u00e9cifications.<\/p>\n<p>\u00c9tablissez une feuille de co\u00fbts install\u00e9s pour les deux options. Utilisez des devis locaux dans la m\u00eame devise et notez la date. S\u00e9parez les co\u00fbts ponctuels des co\u00fbts r\u00e9currents, puis ajoutez une allocation de temps d'arr\u00eat bas\u00e9e sur votre propre exposition aux commandes. Une presse d'occasion bon march\u00e9 avec un entra\u00eenement non pris en charge peut vous exposer \u00e0 plus de co\u00fbts qu'un nouveau mod\u00e8le si une exp\u00e9dition client d\u00e9pend du prochain remplacement disponible. Ces co\u00fbts cach\u00e9s sont la raison pour laquelle une d\u00e9cision d'achat de presse d'impression flexo d'occasion par rapport \u00e0 une neuve ne peut pas s'arr\u00eater \u00e0 la facture.<\/p>\n<p>Le <a href=\"https:\/\/www.zp-flexopress.com\/fr\/blog\/buying-guide\/flexo-printing-machine-price-guide\/\" rel=\"noopener noreferrer\" target=\"_blank\">guide des prix des machines d'impression flexo<\/a> explique les facteurs de co\u00fbts courants des machines neuves, tandis que le <a href=\"https:\/\/www.zp-flexopress.com\/fr\/blog\/buying-guide\/flexo-printing-machine-cost-tco-analysis\/\" rel=\"noopener noreferrer\" target=\"_blank\">guide des prix des presses flexo 2026<\/a> offre un contexte de prix plus large. N'utilisez pas un chiffre de l'une ou l'autre page dans votre comparaison sans faire correspondre la machine et la port\u00e9e. Cet article est la page de d\u00e9cision approfondie pour l'\u00e9quipement neuf par rapport \u00e0 l'occasion.<\/p>\n<h3>Comment normaliser un devis d'occasion et neuf ?<\/h3>\n<p>Commencez par le travail de production, pas par le devis. Notez le substrat et l'\u00e9paisseur, la largeur de la bande, la longueur de r\u00e9p\u00e9tition, le nombre de couleurs, le syst\u00e8me d'encrage, le s\u00e9chage ou le durcissement, la vitesse de production cible, les diam\u00e8tres des rouleaux, l'exigence de finition et les d\u00e9chets acceptables. Utilisez le <a href=\"https:\/\/www.zp-flexopress.com\/fr\/blog\/buying-guide\/flexographic-press-selection-guide\/\" rel=\"noopener noreferrer\" target=\"_blank\">guide de s\u00e9lection de presse flexographique<\/a> pour exposer les choix de configuration et le <a href=\"https:\/\/www.zp-flexopress.com\/fr\/blog\/buying-guide\/select-flexographic-printing-materials\/\" rel=\"noopener noreferrer\" target=\"_blank\">guide des mat\u00e9riaux flexographiques<\/a> pour v\u00e9rifier si chaque presse est \u00e9valu\u00e9e sur un stock appropri\u00e9.<\/p>\n<p>Donnez ensuite aux deux vendeurs la m\u00eame feuille d'exigences. Demandez quels articles sont inclus, lesquels sont des options et lesquels l'acheteur doit organiser. Pour une machine d'impression flexographique d'occasion, ajoutez le co\u00fbt de remplacement des rouleaux us\u00e9s, de r\u00e9paration des commandes, d'ajout de dispositifs de s\u00e9curit\u00e9 requis sur votre march\u00e9, de changement de tension ou d'installation d'\u00e9quipements de finition manquants. Pour une nouvelle machine, supprimez toute fonctionnalit\u00e9 qui ne prend pas en charge le m\u00eame travail afin que les deux propositions couvrent un ensemble de production \u00e9quivalent.<\/p>\n<p>Comparez ces lignes :<\/p>\n<table>\n<thead>\n<tr>\n<th>Ligne de co\u00fbt d'installation<\/th>\n<th>Question sur la nouvelle presse<\/th>\n<th>Question sur la presse d'occasion<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Machine et options<\/td>\n<td>Qu'est-ce qui est inclus dans la nomenclature cot\u00e9e ?<\/td>\n<td>Qu'est-ce qui est physiquement install\u00e9, manquant ou us\u00e9 ?<\/td>\n<\/tr>\n<tr>\n<td>Transport et droits de douane<\/td>\n<td>Qui livre, assure et d\u00e9douane ?<\/td>\n<td>Le levage, l'emballage d'exportation, l'assurance et les douanes sont-ils inclus ?<\/td>\n<\/tr>\n<tr>\n<td>Site et services publics<\/td>\n<td>Quelle alimentation \u00e9lectrique, quel air, quelle \u00e9vacuation et quels travaux de sol sont requis ?<\/td>\n<td>Quels services et composants existants r\u00e9pondent toujours aux sp\u00e9cifications ?<\/td>\n<\/tr>\n<tr>\n<td>Installation et mise en service<\/td>\n<td>Qui effectue le travail, o\u00f9 et quand ?<\/td>\n<td>Qui la r\u00e9pare, la d\u00e9place, l'aligne, la connecte et la met en service ?<\/td>\n<\/tr>\n<tr>\n<td>Formation et documentation<\/td>\n<td>Quelle formation des op\u00e9rateurs et de la maintenance est incluse ?<\/td>\n<td>Les manuels, sch\u00e9mas, sauvegardes et support linguistique sont-ils complets ?<\/td>\n<\/tr>\n<tr>\n<td>Outillage et pi\u00e8ces de rechange<\/td>\n<td>Quels cylindres, manchons, rouleaux anilox et pi\u00e8ces d'usure sont fournis ?<\/td>\n<td>Qu'est-ce qui peut \u00eatre r\u00e9utilis\u00e9 et qu'est-ce qui doit \u00eatre remplac\u00e9 ou r\u00e9-grav\u00e9 ?<\/td>\n<\/tr>\n<tr>\n<td>Acceptation du premier tirage<\/td>\n<td>Quel test prouve les performances cot\u00e9es ?<\/td>\n<td>Quel test prouve les affirmations du vendeur avant que le risque ne vous soit transf\u00e9r\u00e9 ?<\/td>\n<\/tr>\n<tr>\n<td>Temps d'arr\u00eat et r\u00e9cup\u00e9ration<\/td>\n<td>Quel engagement de support, le cas \u00e9ch\u00e9ant, est inscrit dans la commande ?<\/td>\n<td>Qui peut diagnostiquer la machine et \u00e0 quelle vitesse une pi\u00e8ce critique peut-elle arriver ?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Sans ces lignes, le co\u00fbt d'une nouvelle presse flexo et le prix de liste d'une presse d'occasion ne peuvent pas montrer quelle voie est financi\u00e8rement plus solide.<\/p>\n<h2>Quels risques affectent l'enregistrement, la tension et l'usure m\u00e9canique ?<\/h2>\n<p>L'enregistrement signifie maintenir chaque couleur dans la position pr\u00e9vue par rapport aux autres. Le contr\u00f4le de la tension signifie maintenir la force de traction et de maintien sur la bande afin qu'elle ne d\u00e9rive pas et ne s'\u00e9tire pas au point de d\u00e9caler l'impression. Les deux d\u00e9pendent de la m\u00e9canique, des entra\u00eenements, des commandes et du mat\u00e9riau utilis\u00e9. Dans le choix entre une presse flexo d'occasion et une nouvelle, aucun des deux c\u00f4t\u00e9s ne doit \u00eatre accept\u00e9 sans le m\u00eame travail repr\u00e9sentatif.<\/p>\n<p>Sur une nouvelle presse, demandez au fournisseur de lier l'enregistrement acceptable, la stabilit\u00e9 de la tension, la d\u00e9pose de l'encre, le s\u00e9chage et les d\u00e9chets \u00e0 un test repr\u00e9sentatif. Sur une presse d'occasion, la m\u00eame exigence devient une condition d'inspection. Une machine peut fonctionner au ralenti sans probl\u00e8me et produire toujours des d\u00e9rives, des fant\u00f4mes, des marquages de pignons ou des rouleaux rejet\u00e9s une fois qu'elle atteint la vitesse de production. Le <a href=\"https:\/\/www.zp-flexopress.com\/fr\/blog\/basic\/print-quality-management\/\" rel=\"noopener noreferrer\" target=\"_blank\">guide de gestion de la qualit\u00e9 d'impression<\/a> et <a href=\"https:\/\/www.zp-flexopress.com\/fr\/blog\/buying-guide\/troubleshooting-flexo-printing-defects\/\" rel=\"noopener noreferrer\" target=\"_blank\">guide de d\u00e9pannage des d\u00e9fauts flexo<\/a> expliquer pourquoi la sortie visuelle et la stabilit\u00e9 du processus doivent \u00eatre v\u00e9rifi\u00e9es ensemble.<\/p>\n<h3>Comment tester l'enregistrement et la tension ?<\/h3>\n<p>Faites fonctionner votre stock ou un \u00e9quivalent proche \u00e0 basse, moyenne et vitesse de production cible. Enregistrez l'enregistrement au d\u00e9marrage, apr\u00e8s chaque changement de vitesse et apr\u00e8s que la presse se soit stabilis\u00e9e. V\u00e9rifiez les deux bords et le centre de la bande pour les d\u00e9rives, les enroulements, le mou, les froissements et les changements de largeur. Inspectez une longue r\u00e9p\u00e9tition pour un mouvement graduel. R\u00e9p\u00e9tez avec le mat\u00e9riau et la largeur de rouleau que vous pr\u00e9voyez d'utiliser le plus souvent.<\/p>\n<p>Convenez de la mani\u00e8re dont vous mesurerez la r\u00e9ussite ou l'\u00e9chec. Une comparaison avec une \u00e9preuve sign\u00e9e et un \u00e9chantillon conserv\u00e9 est plus utile qu'une opinion telle que \u201c cela semble bon \u201d. Enregistrez la vitesse de test, la largeur de la bande, le substrat, l'encre, le r\u00e9glage de s\u00e9chage et la manipulation du rouleau. Si le vendeur ne peut pas effectuer le travail, consid\u00e9rez le manque de preuves comme une lacune de qualification plut\u00f4t que de supposer que la machine fonctionnera apr\u00e8s l'installation.<\/p>\n<h3>Quelle usure m\u00e9canique devrait soulever un drapeau rouge ?<\/h3>\n<p>L'\u00e2ge seul ne d\u00e9termine pas l'\u00e9tat. Les enregistrements de maintenance, les heures de fonctionnement, le m\u00e9lange de substrats, les r\u00e9parations pr\u00e9c\u00e9dentes et les mesures directes sont plus importants. Inspectez le ch\u00e2ssis pour les fissures ou les r\u00e9parations mal document\u00e9es. V\u00e9rifiez les engrenages et les cha\u00eenes pour le jeu, les dents manquantes, l'allongement ou le bruit inhabituel. Recherchez le jeu des roulements, la chaleur et les vibrations. Examinez les cylindres porte-clich\u00e9s, les manchons, les rouleaux anilox, l'\u00e9tat de la racle et le cylindre d'impression central sur une presse CI.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1672\" height=\"941\" alt=\"L&#039;en-t\u00eate indique Condition needs inspection au-dessus d&#039;une grande presse flexo et d&#039;un gros plan de ses rouleaux \u00e9tiquet\u00e9s Roll surfaces et Wear + contamination.\" class=\"wp-image-2441\" src=\"https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/01-mechanical-check.webp\" srcset=\"https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/01-mechanical-check.webp 1672w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/01-mechanical-check-500x281.webp 500w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/01-mechanical-check-1200x675.webp 1200w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/01-mechanical-check-300x169.webp 300w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/01-mechanical-check-768x432.webp 768w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/01-mechanical-check-1536x864.webp 1536w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/01-mechanical-check-18x10.webp 18w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/01-mechanical-check-133x75.webp 133w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/01-mechanical-check-480x270.webp 480w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/01-mechanical-check-800x450.webp 800w\" sizes=\"auto, (max-width:767px) 480px, (max-width:1672px) 100vw, 1672px\" \/><\/p>\n<p>Le <a href=\"https:\/\/www.zp-flexopress.com\/fr\/blog\/buying-guide\/printing-press-components-and-parts\/\" rel=\"noopener noreferrer\" target=\"_blank\">guide des composants de presse<\/a> fournit une carte utile de ces pi\u00e8ces, tandis que le <a href=\"https:\/\/www.zp-flexopress.com\/fr\/blog\/buying-guide\/label-flexo-printing-machine-maintenance-guide\/\" rel=\"noopener noreferrer\" target=\"_blank\">guide d'entretien flexo \u00e9tiquet\u00e9<\/a> montre ce que les soins de routine auraient d\u00fb couvrir. Un d\u00e9faut devient critique pour la d\u00e9cision lorsqu'il peut se r\u00e9p\u00e9ter dans l'impression, consommer une pi\u00e8ce de rechange rare ou n\u00e9cessiter le retrait d'un assemblage majeur. Demandez des preuves et une estimation de r\u00e9paration avant de le consid\u00e9rer comme une usure normale.<\/p>\n<h2>Les anciennes commandes, logiciels ou pi\u00e8ces de rechange vous freineront-ils ?<\/h2>\n<p>Les anciens \u00e9quipements peuvent bien fonctionner et rester commercialement fragiles. Une carte de contr\u00f4leur ou de lecteur peut \u00eatre obsol\u00e8te, une sauvegarde logicielle peut manquer ou une int\u00e9gration peut d\u00e9pendre d'un ordinateur qui ne re\u00e7oit plus de mises \u00e0 jour de s\u00e9curit\u00e9. L'\u00e2ge ne prouve pas l'obsolescence, mais il rend une v\u00e9rification sp\u00e9cifique au mod\u00e8le n\u00e9cessaire.<\/p>\n<h3>Quels d\u00e9tails de contr\u00f4le n\u00e9cessitent une confirmation \u00e9crite ?<\/h3>\n<p>Enregistrez les d\u00e9tails du PLC, de l'IHM, de l'entra\u00eenement, du moteur, de l'encodeur, du capteur et de l'enregistrement par marque et mod\u00e8le. Demandez les versions logicielles actuelles, les sauvegardes de param\u00e8tres, les mots de passe ou les arrangements de r\u00e9cup\u00e9ration autoris\u00e9s, les licences, les sch\u00e9mas et les journaux d'erreurs. Identifiez qui peut modifier les param\u00e8tres et qui poss\u00e8de le logiciel. Si une connexion \u00e0 distance est utilis\u00e9e, d\u00e9finissez le chemin d'acc\u00e8s, la responsabilit\u00e9 de la s\u00e9curit\u00e9 et ce qui se passe en cas d'\u00e9chec de l'aide \u00e0 distance.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1672\" height=\"941\" alt=\"Diapositive intitul\u00e9e Controls: identify and verify montrant une grande presse flexo blanche et une station de contr\u00f4le avec des \u00e9crans tactiles, des boutons et des indicateurs, \u00e9tiquet\u00e9e comme photos de r\u00e9f\u00e9rence.\" class=\"wp-image-2442\" src=\"https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/02-controls-support.webp\" srcset=\"https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/02-controls-support.webp 1672w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/02-controls-support-500x281.webp 500w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/02-controls-support-1200x675.webp 1200w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/02-controls-support-300x169.webp 300w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/02-controls-support-768x432.webp 768w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/02-controls-support-1536x864.webp 1536w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/02-controls-support-18x10.webp 18w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/02-controls-support-133x75.webp 133w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/02-controls-support-480x270.webp 480w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/02-controls-support-800x450.webp 800w\" sizes=\"auto, (max-width:767px) 480px, (max-width:1672px) 100vw, 1672px\" \/><\/p>\n<p>Une presse sans engrenage utilise des unit\u00e9s d'impression ind\u00e9pendantes contr\u00f4l\u00e9es par servomoteur ; une presse \u00e0 engrenages utilise un train m\u00e9canique commun. Cette distinction peut modifier le chemin de d\u00e9faillance et les comp\u00e9tences de maintenance requises, mais elle ne remplace pas le choix distinct entre les configurations CI et empil\u00e9es. La <a href=\"https:\/\/www.zp-flexopress.com\/fr\/blog\/buying-guide\/gearless-flexo-printing-press-vs-geared\/\" rel=\"noopener noreferrer\" target=\"_blank\">guide des presses sans engrenage par rapport aux presses \u00e0 engrenages<\/a> aide l'acheteur \u00e0 s\u00e9parer ces questions.<\/p>\n<p>Pour une nouvelle presse, demandez au fournisseur de lister le progiciel de contr\u00f4le exact et la p\u00e9riode de support logiciel. La page d'usine de RAZP <a href=\"https:\/\/www.zp-flexopress.com\/fr\/factory\/\" rel=\"noopener noreferrer\" target=\"_blank\">page d'usine<\/a> d\u00e9crit les capacit\u00e9s d'usinage et de contr\u00f4le d'entra\u00eenement, et sa <a href=\"https:\/\/www.zp-flexopress.com\/fr\/quality\/\" rel=\"noopener noreferrer\" target=\"_blank\">processus de contr\u00f4le qualit\u00e9<\/a> d\u00e9crit les v\u00e9rifications par \u00e9tapes, la tra\u00e7abilit\u00e9 et les tests. Traitez ces \u00e9l\u00e9ments comme des preuves publi\u00e9es par le fournisseur et demandez les documents pour le mod\u00e8le et le num\u00e9ro de s\u00e9rie exacts.<\/p>\n<p>La diff\u00e9rence est importante dans une comparaison de presses d'impression flexo d'occasion par rapport \u00e0 une neuve, car une ancienne machine \u00e0 engrenages et un mod\u00e8le actuel contr\u00f4l\u00e9 par servomoteur peuvent vous exposer \u00e0 diff\u00e9rentes comp\u00e9tences de r\u00e9paration, diagnostics et besoins en pi\u00e8ces de rechange. Utilisez le <a href=\"https:\/\/www.zp-flexopress.com\/fr\/product\/full-servo-satellite-flexographic-printing-machine500m-min\/\" rel=\"noopener noreferrer\" target=\"_blank\">exemple de presse CI enti\u00e8rement servo de RAZP<\/a> pour voir quels d\u00e9tails de contr\u00f4le un produit actuel sp\u00e9cifie, puis demandez au vendeur d'occasion les faits \u00e9quivalents sur l'unit\u00e9 exacte.<\/p>\n<h3>Comment v\u00e9rifier la disponibilit\u00e9 des pi\u00e8ces de rechange ?<\/h3>\n<p>Listez les points de d\u00e9faillance qui arr\u00eateraient la production : module d'entra\u00eenement, carte de contr\u00f4le, moteur, encodeur, capteur d'enregistrement, cellule de mesure de tension, m\u00e9canisme de racle, rouleau anilox, cylindres ou manchons, roulements et contr\u00f4les de s\u00e9chage. Obtenez un num\u00e9ro de pi\u00e8ce, un prix actuel, un d\u00e9lai de livraison et une source pour chacun. Confirmez si un OEM, le revendeur local ou un reconstructeur qualifi\u00e9 tiers peut le fournir.<\/p>\n<p>N'acceptez pas une d\u00e9claration g\u00e9n\u00e9rique selon laquelle \u201c les pi\u00e8ces sont disponibles \u201d. Demandez le num\u00e9ro de s\u00e9rie exact et obtenez la r\u00e9ponse par \u00e9crit. \u00c9valuez un jeu de d\u00e9marrage de pi\u00e8ces d'usure critiques et d\u00e9cidez de l'exposition que vous pouvez supporter. Si une seule carte non prise en charge peut arr\u00eater la ligne sans voie de r\u00e9paration, l'option d'occasion repr\u00e9sente un risque de production m\u00eame lorsque le test de fonctionnement r\u00e9ussit.<\/p>\n<h2>Que doit inclure une inspection de presse d'occasion ?<\/h2>\n<p>Une liste de contr\u00f4le d'inspection de presse d'occasion doit faire plus qu'enregistrer l'\u00e9tat cosm\u00e9tique. Utilisez ce guide d'achat de presse flexo d'occasion pour organiser les preuves avant une offre, un acompte ou une lib\u00e9ration de contrat, et faites v\u00e9rifier les \u00e9l\u00e9ments critiques pour la s\u00e9curit\u00e9 par un inspecteur m\u00e9canique et \u00e9lectrique qualifi\u00e9 conform\u00e9ment aux exigences locales. Les photos sont utiles pour le d\u00e9pistage ; elles ne constituent pas une preuve d'acceptation.<\/p>\n<h3>Quels documents et observations sont importants ?<\/h3>\n<ul>\n<li>Num\u00e9ro de s\u00e9rie, mod\u00e8le, date de fabrication et configuration compl\u00e8te.<\/li>\n<li>Journaux de maintenance, enregistrements des heures de fonctionnement, m\u00e9lange de substrats, sch\u00e9ma des \u00e9quipes et historique des r\u00e9parations.<\/li>\n<li>Manuels d'origine, sch\u00e9mas \u00e9lectriques, sauvegardes logicielles, listes de param\u00e8tres et journaux d'erreurs.<\/li>\n<li>Ch\u00e2ssis, capots, protections, arr\u00eats d'urgence, interverrouillages, c\u00e2blage, refroidissement de l'armoire, fuites, rouille et signes d'impact ou de r\u00e9paration.<\/li>\n<li>Chemin de bande, d\u00e9rouleur, enrouleur, rouleaux de tension, cellules de mesure, guides de bord et \u00e9quipement de raboutage ou de changement de rouleau.<\/li>\n<li>Cylindres de clich\u00e9, manchons, engrenages, cha\u00eenes, roulements, rouleaux anilox, racles, tambour CI et train d'entra\u00eenement. Le <a href=\"https:\/\/www.zp-flexopress.com\/fr\/blog\/buying-guide\/printing-cylinders-vs-sleeves\/\" rel=\"noopener noreferrer\" target=\"_blank\">guide des cylindres d'impression par rapport aux manchons<\/a> vous aide \u00e0 identifier quel syst\u00e8me le devis ou la machine d'occasion utilise r\u00e9ellement.<\/li>\n<li>Chaque poste de contr\u00f4le, alarme, dispositif de s\u00e9curit\u00e9, moteur, encodeur et syst\u00e8me d'enregistrement ou d'inspection.<\/li>\n<li>Outillage existant, pi\u00e8ces de rechange et nom du technicien qui a entretenu la machine en dernier.<\/li>\n<\/ul>\n<p>Photographiez les d\u00e9fauts et ajoutez des mesures ou des notes ind\u00e9pendantes. Demandez au vendeur d'expliquer les enregistrements manquants plut\u00f4t que de combler le vide par une supposition. Une machine solide avec des enregistrements faibles peut toujours \u00eatre qualifi\u00e9e, mais seulement apr\u00e8s une inspection directe et une allocation de prix d\u00e9finie pour les travaux inconnus.<\/p>\n<h3>Que doit prouver un test de fonctionnement ?<\/h3>\n<p>Le test de fonctionnement doit utiliser le substrat, le graphisme, le jeu de couleurs, la largeur de bande et la taille de rouleau repr\u00e9sentatifs. Ex\u00e9cutez une s\u00e9quence de pr\u00e9paration, une s\u00e9quence de vitesse de production, et un arr\u00eat et red\u00e9marrage normaux si la machine les prend en charge. V\u00e9rifiez l'enregistrement, le d\u00e9p\u00f4t d'encre, le s\u00e9chage, le fant\u00f4me, les marques d'engrenage, les tra\u00een\u00e9es, la stabilit\u00e9 des bords, les d\u00e9chets et la qualit\u00e9 du rouleau.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1672\" height=\"941\" alt=\"Une grande presse d&#039;impression flexo blanche dans une installation propre, montr\u00e9e avec un sch\u00e9ma de processus de rouleaux de mat\u00e9riau blanc devenant un film imprim\u00e9 color\u00e9 et des \u00e9chantillons d&#039;impression finis.\" class=\"wp-image-2443\" src=\"https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/03-representative-trial.webp\" srcset=\"https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/03-representative-trial.webp 1672w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/03-representative-trial-500x281.webp 500w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/03-representative-trial-1200x675.webp 1200w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/03-representative-trial-300x169.webp 300w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/03-representative-trial-768x432.webp 768w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/03-representative-trial-1536x864.webp 1536w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/03-representative-trial-18x10.webp 18w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/03-representative-trial-133x75.webp 133w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/03-representative-trial-480x270.webp 480w, https:\/\/www.zp-flexopress.com\/wp-content\/uploads\/2026\/11\/03-representative-trial-800x450.webp 800w\" sizes=\"auto, (max-width:767px) 480px, (max-width:1672px) 100vw, 1672px\" \/><\/p>\n<p>R\u00e9digez les crit\u00e8res d'acceptation avant le test. Incluez la norme du produit, l'\u00e9chantillon de test \u00e0 conserver, la vitesse cible, les d\u00e9chets autoris\u00e9s pour l'exercice et ce qui se passe si la sortie \u00e9choue. Pour les achats \u00e0 distance, demandez une vid\u00e9o continue et horodat\u00e9e du m\u00eame test et organisez une inspection locale si possible. Une liste de contr\u00f4le d'inspection de presse d'occasion est plus solide lorsque le vendeur doit respecter les conditions nomm\u00e9es, et non lorsqu'elle se termine par une assurance verbale.<\/p>\n<h2>Comment la garantie, la formation et le support apr\u00e8s-vente modifient-ils la d\u00e9cision ?<\/h2>\n<p>Une \u00e9tiquette de garantie a peu de valeur d\u00e9cisionnelle jusqu'\u00e0 ce que vous connaissiez la date de d\u00e9but, les composants couverts, la main-d'\u0153uvre, les d\u00e9placements, le fret, les exclusions, les recours et la proc\u00e9dure de r\u00e9clamation. Demandez comment un entra\u00eenement ou un contr\u00f4leur d\u00e9fectueux sera g\u00e9r\u00e9, si les pi\u00e8ces de rechange sont neuves ou reconditionn\u00e9es, et qui paie pour le retrait et le remontage.<\/p>\n<p>Les voies d'acc\u00e8s aux presses d'occasion varient. Une vente aux ench\u00e8res peut vendre la machine telle quelle, sans support apr\u00e8s-vente, tandis qu'un revendeur peut proposer une remise \u00e0 neuf et une garantie limit\u00e9e. Une vente directe peut laisser le transport, l'installation et le support \u00e0 l'acheteur. Adaptez le niveau de recours \u00e0 vos capacit\u00e9s internes. Une \u00e9quipe de production avec des m\u00e9caniciens exp\u00e9riment\u00e9s et une voie de pi\u00e8ces fiable peut g\u00e9rer des risques qui seraient inacceptables pour une op\u00e9ration pour la premi\u00e8re fois.<\/p>\n<p>La d\u00e9claration de garantie publi\u00e9e par RAZP sp\u00e9cifie une garantie d'un an sur la machine compl\u00e8te. Les exclusions exactes et la r\u00e8gle de d\u00e9part doivent encore \u00eatre confirm\u00e9es dans la commande. Si vous achetez par l'interm\u00e9diaire d'un revendeur, demandez les <a href=\"https:\/\/www.zp-flexopress.com\/fr\/flexo-press-distributor\/\" rel=\"noopener noreferrer\" target=\"_blank\">conditions de support du revendeur<\/a>; son programme d\u00e9crit s\u00e9par\u00e9ment une couverture d'un an pour la machine et de trois ans pour les composants principaux et ne doit pas \u00eatre suppos\u00e9 pour une commande directe.<\/p>\n<h3>Que doit dire le contrat ?<\/h3>\n<p>Nommez la port\u00e9e livr\u00e9e, le point d'exp\u00e9dition, le risque de perte, les conditions du site, la responsabilit\u00e9 de l'installation, les \u00e9tapes de mise en service, le contenu de la formation, le d\u00e9but de la garantie, les engagements en mati\u00e8re de pi\u00e8ces de rechange, le test d'acceptation, les \u00e9tapes de paiement et le recours en cas d'\u00e9chec de l'acceptation. Pour l'\u00e9quipement d'occasion, exigez \u00e9galement la description de l'\u00e9quipement par le vendeur, la divulgation des d\u00e9fauts connus, l'inventaire des outils et logiciels inclus, et le droit d'inspecter avant le paiement final.<\/p>\n<p>RAZP&#039;s <a href=\"https:\/\/www.zp-flexopress.com\/fr\/faq\/\" rel=\"noopener noreferrer\" target=\"_blank\">page FAQ<\/a> dit que l'installation, la mise en service et les tests d'\u00e9chantillons sont disponibles, mais que la port\u00e9e d\u00e9pend du projet. Mettez cette port\u00e9e dans le devis au lieu de l'inf\u00e9rer d'une page de service g\u00e9n\u00e9rale. La m\u00eame r\u00e8gle s'applique \u00e0 la formation : sp\u00e9cifiez qui participe, ce qu'il apprend, o\u00f9 cela se d\u00e9roule et si le support de suivi inclut la version de contr\u00f4le r\u00e9elle de la machine.<\/p>\n<h2>Quand une presse d'occasion peut-elle encore avoir du sens ?<\/h2>\n<p>Une presse d'occasion peut encore avoir du sens lorsqu'elle correspond \u00e0 une commande d\u00e9finie, r\u00e9ussit un test de fonctionnement repr\u00e9sentatif, a un historique de maintenance cr\u00e9dible et ne d\u00e9pend pas d'un composant unique et obsol\u00e8te. Elle est \u00e9galement plus r\u00e9alisable lorsque votre \u00e9quipe peut inspecter, entretenir et d\u00e9panner le mod\u00e8le, ou lorsqu'un fournisseur de services local qualifi\u00e9 inscrira ces capacit\u00e9s dans un plan de support.<\/p>\n<p>La voie m\u00e9rite une s\u00e9rieuse consid\u00e9ration pour les ajouts de capacit\u00e9 o\u00f9 le travail est stable, la configuration de la machine est d\u00e9j\u00e0 appropri\u00e9e et le co\u00fbt tout compris reste inf\u00e9rieur apr\u00e8s les r\u00e9parations, l'installation, la formation, les pi\u00e8ces et l'exposition aux temps d'arr\u00eat. Elle peut \u00e9galement convenir \u00e0 une application sp\u00e9cialis\u00e9e qu'un nouveau mod\u00e8le actuel ne peut pas configurer \u00e9conomiquement. La conclusion devrait d\u00e9couler de ces conditions, et non de l'\u00e2ge ou d'une remise cit\u00e9e.<\/p>\n<p>L'occasion devient un choix faible lorsque la gamme de substrats ou de finitions requise est incertaine, que les commandes et les logiciels ne sont pas pris en charge, que les pi\u00e8ces critiques n'ont pas de source viable, que le vendeur bloque un test de fonctionnement appropri\u00e9 ou que l'usine ne peut pas absorber les temps d'arr\u00eat. Dans ces cas, une nouvelle configuration peut \u00eatre plus facile \u00e0 g\u00e9rer lorsque sa construction, son plan d'acceptation et sa voie de support sont document\u00e9s.<\/p>\n<h2>Quelle est la meilleure prochaine \u00e9tape ?<\/h2>\n<p>Cr\u00e9ez une feuille d'exigences et une feuille de co\u00fbts install\u00e9s, puis demandez aux deux vendeurs de r\u00e9pondre aux m\u00eames questions. Pour une nouvelle presse, cela signifie examiner la <a href=\"https:\/\/www.zp-flexopress.com\/fr\/collection\/\" rel=\"noopener noreferrer\" target=\"_blank\">collection de presses flexo<\/a> et la <a href=\"https:\/\/www.zp-flexopress.com\/fr\/product-category\/printing-machines\/\" rel=\"noopener noreferrer\" target=\"_blank\">cat\u00e9gorie de produits de machines d'impression<\/a> pour identifier les configurations pertinentes. Pour une presse d'occasion, cela signifie obtenir les enregistrements, un rapport d'inspection, un plan de test de fonctionnement et une confirmation \u00e9crite pour les commandes et les pi\u00e8ces critiques avant que la n\u00e9gociation ne passe au prix.<\/p>\n<p>La d\u00e9cision n'est pas automatiquement neuve ou d'occasion. C'est l'option dont le package de production v\u00e9rifi\u00e9 et la voie de support correspondent au travail, \u00e0 l'\u00e9quipe et aux temps d'arr\u00eat que l'entreprise peut supporter.<\/p>\n<p>Partagez votre substrat, largeur d'impression, nombre de couleurs, sortie requise et conditions du site avec RAZP pour discuter d'une configuration de presse appropri\u00e9e. Utilisez la <a href=\"https:\/\/www.zp-flexopress.com\/fr\/contact\/\" rel=\"noopener noreferrer\" target=\"_blank\">page de demande de configuration<\/a> lorsque la feuille d'exigences est pr\u00eate.<\/p>","protected":false},"excerpt":{"rendered":"<p>Quick Answer Choose a new flexo press when you need a defined configuration and one supplier to own specification, commissioning, and support.<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":1,"featured_media":2440,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[],"class_list":["post-2444","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buying-guide"],"_links":{"self":[{"href":"https:\/\/www.zp-flexopress.com\/fr\/wp-json\/wp\/v2\/posts\/2444","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zp-flexopress.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zp-flexopress.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zp-flexopress.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zp-flexopress.com\/fr\/wp-json\/wp\/v2\/comments?post=2444"}],"version-history":[{"count":0,"href":"https:\/\/www.zp-flexopress.com\/fr\/wp-json\/wp\/v2\/posts\/2444\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zp-flexopress.com\/fr\/wp-json\/wp\/v2\/media\/2440"}],"wp:attachment":[{"href":"https:\/\/www.zp-flexopress.com\/fr\/wp-json\/wp\/v2\/media?parent=2444"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zp-flexopress.com\/fr\/wp-json\/wp\/v2\/categories?post=2444"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zp-flexopress.com\/fr\/wp-json\/wp\/v2\/tags?post=2444"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}